Plot line and mark the height of pile in, confirm the position of the pile in. Information collection and become familiar with the specifications.
(2) where the callout control points
Locus of control refers to the influence of road longitudinal slope design of elevation points. Such as route, destination, key bridges and culverts, adverse geological sections of the minimum fill, maximum digging depth, main buildings along the roads, intersections and other factors limit the elevation of the road through the control points, and so on.
(3) test
Try slope mainly in the already marked "control points" Profile based on the intentions of technical indicators and line selection, combined with the up and down, in a "control point" basis, taking into account the majority of "economic" principle, in interludes between those points and cut-off straightened, try to set aside a certain straight slope line. To compare all possible straight line again, elect conforms to the technical standards, and meet point requirements and early earthwork design lines in the province as straight lines, straight slope line extension, set the initial position of grade change.
(4) adjustments
After the trial, will be set by the longitudinal line longitudinal to consider when comparing both should meet. If there is a difference, it should conduct a comprehensive analysis to find out the causes, checked against the specification and design of maximum longitudinal slope, slope gradient and slope length of synthesis and so on whether met regulatory requirements, coordination of horizontal alignment and vertical alignment the desirability and so on.
(5) check
According to the adjusted straight slope line, select the cross section of key controls, such as the high fill retaining wall in deep excavation, and an important bridge and culvert sections, read out the corresponding directly to the Profile in the piles of fill (dig) height and check for cut and fill, slope foot fall to the ground or retaining the.
(6)
After adjustment check that can be set. Are piecewise straight lines of slope gradient, grade change point position (number) and elevations determined. General to adjust the grade change point to 5M or 10m on the whole, change of elevation based on longitudinal slopes, slope lengths in turn calculated to determine.
(7) the longitudinal design results as shown in table 1
0/5000
原始語言: -
目標語言: -
結果 (中文) 1: [復制]
復制成功!
(1)辛苦准备
情节线和标志桩的高度,确认桩的位置。信息收集和熟悉的规格。
(2)凡标注控制点
控制源指的高程点道路纵坡设计的影响。如路线,目的地,键桥涵,最小的不利地质螺纹部分,最大挖掘深度,沿着道路,交叉路口等的因素主要建筑物限制道路的标高通过控制点,等等。
(3)测试
试坡主要是基于配置文件的技术指标和选线的意图已经标有“控制点”,结合上下,在“控制点”的基础上,考虑到“经济”原则的大多数,在那些截点和拉直之间穿插,尽量留出某些斜率直线。要再次比较所有可能的直线,符合技术标准ELECT,并满足点要求和年初土方的线条设计在全省为直线,直线的斜率延伸,集品位变化的初始位置。
(4)调整
庭审结束后,将由纵线设置时需要考虑的纵向比较,两者不应该满足。如果是有区别的,它不应该进行全面的分析,找出原因,核对规格和最大纵坡,坡度和坡长合成的设计等无论监管要求得到满足,水平对齐方式和垂直对齐的可取性等协调。
(5)检查
根据调整后的直线斜率线,选择关键控制,如在深基坑开挖高丝挡土墙,一个重要的桥梁和涵洞段的横截面,读出直接对应于成堆的档案纱(DIG)高度的时间并为切纱,坡脚或掉在地上保留了。
(6)
调整检查后可以是集。确定坡度,高档点的变化位置(号)和海拔的分段直线。一般以调整等级变化点为5M或10米整体上,基于纵坡海拔的变化,进而计算斜坡长度确定。
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.